Voyager Projects
Delivering HVAC Results Across Commercial, Hospitality & Critical Sites
From commercial facilities to complex infrastructure, our projects span precision installations, energy-efficient upgrades, and fully integrated HVAC system overhauls — all delivered with engineering precision, BMS expertise, and minimal disruption.
Proven Project Delivery, Backed by Experience
Smart HVAC Upgrades, Seamless Execution, Lasting Results
We deliver HVAC installations with a focus on performance, compliance, and site-specific needs. Every system is designed for long-term reliability, not just a quick fix.
1. Precision in Every Project
From design and equipment selection to testing and handover, we manage the entire project lifecycle — with one team, clear timelines, and zero handover confusion.
2. Start-to-Finish Delivery
Whether it’s a data centre, hotel, or high-traffic venue, we work within live environments and deliver results with minimal disruption to your operations.
3. Built for Demanding Environments
We act as a single point of contact — backed by trusted subcontractors — to provide seamless communication, consistent outcomes, and a collaborative experience.
4. Smarter Systems, Better Outcomes
Central Plant Upgrade
Sector
Hotel/Commercial Building
Project Type
Full Mechanical Plant Replacement & BMS Integration
Full HVAC plant replacement with BMS integration.
Location
Norwest, NSW 2153
Year
2024
Overview
This project involved the complete end-of-life replacement of key HVAC infrastructure at a major hotel and commercial facility in Norwest. The goal was to renew ageing equipment with high-efficiency plant while integrating modern control systems to enhance performance and reduce operational risk.
Scope of Works
Voyager Services was contracted to deliver the full mechanical replacement of:
2 × air-cooled chillers
3 × chilled water pumps (CHWP)
2 × heating water pumps (HTWP)
1 × gas-fired condensing boiler
All associated valves, pipework (copper and stainless steel), electrical cabling, and control systems
Additional key inclusions:
Full integration into the existing BMS, with upgraded graphical interface
Installation of new automatic control systems
Final testing and commissioning of all mechanical systems
Detailed Deliverables
Decommissioning & Removal:
Two existing chillers
Three chilled water pumps
One gas boiler
Two heating water pumps
Installation & Construction:
New chillers, boiler, and associated pumps
New pipework to match site layout and copper/stainless-steel systems
Overflashing of all roof/external penetrations
Design and supply of vibration isolators and seismic restraints
All electrical wiring, control cabling, and revised plant connection
BMS graphical upgrade to include new systems
Project Approach
Voyager worked closely with stakeholders to offer multiple value-engineered options, focusing on upfront cost savings without compromising on system reliability. Mechanical systems were carefully selected based on the hotel’s usage profile, plantroom access, and footprint limitations. Project stages were tightly managed to ensure minimal disruption to ongoing hotel operations.
Outcomes
Renewed and reliable HVAC plant delivering improved thermal efficiency
Seamless BMS integration for centralised monitoring and control
On-time project delivery within the nominated schedule

Sports Club AC Upgrade
Efficient rooftop unit upgrade with structural mods.
Sector
Hospitality/Community
Project Type
Rooftop Packaged Unit Replacement
Location
Birrong, NSW 2143
Year
2024
Overview
Voyager Services was engaged to replace two ageing rooftop packaged air conditioning systems at a well-used community sports club in Birrong. This upgrade required mechanical and structural adjustments, with a focus on energy performance and minimal disruption to site operations.
Scope of Works
The project involved the replacement of:
AC3 – Temperzone OPA705 (70kW) Rooftop packaged unit
AC5 – Temperzone OPA970 (100kW) Rooftop packaged unit
All works included full mechanical and electrical decommissioning, rooftop structural modifications, and recommissioning of the new units.
Detailed Deliverables
Preparation of all WHS documentation and site inductions
Isolation of services (electrical and mechanical)
Safe removal of all connected ductwork and infrastructure
Dismantling and crane-lift removal of old rooftop units
Modifications to steel base structure to suit new equipment
Hoisting and placement of new packaged systems
Installation of new duct transitions, drainage, and control services
Electrical reconnection and operational testing
Project Approach
Voyager provided the client with alternative system options to improve energy efficiency. We proposed completing both replacements simultaneously to streamline works and reduce cost. Coordination with the club’s management team ensured minimal operational disruption during the upgrade.
Outcomes
Two new energy-efficient rooftop AC systems commissioned
Improved thermal performance and system longevity
Delivered on time, with zero impact to daily club activities
Let’s Work Together!
Whether you’re managing a data centre, a high-traffic venue, or a complex facility, we’re ready to support your HVAC performance goals with smart solutions and reliable service.